jiangsu zhonghou chemical engineering technology co.,ltd

Jiangsu Zhonghou Chemical Engineering Technology Co.,Ltd.

Manufacturer from China
Active Member
6 Years
Home / Products / Swimming Pool Starting Platform /

Two Steps Swimming Pool Diving Platform , Durable Swimming Pool Starting Block

Contact Now
jiangsu zhonghou chemical engineering technology co.,ltd
Province/State:jiangsu
Country/Region:china
Contact Person:MrJerry Li
Contact Now

Two Steps Swimming Pool Diving Platform , Durable Swimming Pool Starting Block

Ask Latest Price
Video Channel
Brand Name :ZOKO
Place of Origin :China
MOQ :1 set
Price :Negotiation
Payment Terms :L/C, T/T
Supply Ability :100 sets per year
Delivery Time :3-8 months
Packaging Details :Follow the packing standard of sea shipment
product name :starting platform
material :stainless steel
color :blue
steps :2
size :500mm*500mm*600mm
standard :meet FINA's requirement
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Two steps swimming pool starting platform Durable stainless steel diving platform

Equipment features:

1). Swimming pool starting platform appearance must meet the requirements of FINA. For example: installation swimming pool starting platform surface need to higher than 50-70 cm above the surface of the water, the starting board at least 50 cm square meter, the forward tilt is <10ordm.

2). Diving platform technical need meet requirements of the provisions of FINA. For example: the handshake must be designed in the fron of diving platform and higher water surface 30-60 cm. the starting handshake is on the same vertical surface. The horizontal grips are parallel to the horizontal plane and the vertical grip is perpendicular to the horizontal plane. The starting edge of the forefront of the thickness of not more than 4 cm, or both sides of the starting table at least 10 cm long front at least 40 cm long into the body 3 cm handshake slot.

3). The starting station material need durable, not rust, no corrosion, and diving platform is non-slip material, mark clear Arabic numerals around diving platform.

4). The starting block panel is made of ABS and conforms to international standards. The surface is anti-slippery. The sustaining bracket underneath is made of 304 stainless steel, which is durable and strong.

5). The starting block measures up international standard. Made of ABS,skid proof surface,standard size,high quality.

Type Standard swimming pool starting block
Size 500*500*600mm
Step Two steps starting block
Material Stainles steel and FRP
Feature UV protection, skid resistance, easy install, detachable

Two Steps Swimming Pool Diving Platform , Durable Swimming Pool Starting Block

Two Steps Swimming Pool Diving Platform , Durable Swimming Pool Starting Block

Features of Swimming Pool Starting Block
1). Luxury competition one or two steps starting block.
2). Environmentally friendly materials:stainless steel and ABS,instead of FRP.
3). Anti-slippery and save.
4). Disassembly,saving the volume to shipping,the ABS panel is replaceable.
5). Numbers can be attached.
6). Standard structure, beautiful design and easy installation.
7). The platform can be replaced.

Inquiry Cart 0